Skip to main content

FLATS DISTRICT

Program
NYS Historic
Subject
Site
Location
33 E Bayard St, Seneca Falls, NY 13148, USA
Lat/Long
42.908922789949, -76.794146546568
Grant Recipient
Seneca County Historian
Historic Marker

FLATS DISTRICT

Inscription

FLATS DISTRICT
NEIGHBORHOOD FLOODED IN
1915 TO EXPAND BARGE CANAL
& CREATE THIS LAKE. SEVERAL
INDUSTRIAL COMPANIES & OVER
50 RESIDENTS FORCED TO VACATE.
WILLIAM G. POMEROY FOUNDATION 2026

The modernization of New York’s waterways reached a dramatic turning point with the Barge Canal Improvement Act of 1903. While the act aimed to revolutionize shipping efficiency across the Erie, Champlain, and Oswego canals, it was Chapter 391 of the Laws of 1909 that forever altered the landscape of Seneca Falls.

To expand the Cayuga and Seneca Canal, the state targeted the Flats District, a prosperous upper-middle-class neighborhood that served as the industrial and residential heart of the village. The plan was ambitious and destructive: the state intended to flood the district to create a massive basin, increasing water power through a new tandem lock system.

The appropriation process was a bureaucratic marathon involving the State Comptroller, Attorney General, and State Engineer. Every parcel was meticulously mapped to compensate owners, leading to a mass exodus. By 1911, major employers like the American La France Fire Engine Co. and Harrison Malt Mill had vacated.

The project also caused residential displacement. By the summer of 1914, families began searching for new homes. A few months later, Levenson Wrecking Company was contracted to demolish structures in the canal path. While most structures were razed, some houses were saved and rolled to new locations using logs and horses.

By August 1915, the Flats District had vanished beneath a new lake (later named Van Cleef) with an average depth of 20 feet. In its place stood a $1 million infrastructure marvel consisting of twin locks, a dam, and retaining walls. Including property reimbursements, the total cost of the project reached approximately $3 million.

The project was polarizing. While many mourned the loss of their neighborhood, others heralded the new waterfall and its resulting waterpower as “the beginning of a new era” for Seneca Falls. The Seneca Falls Power Plant was constructed at the newly completed locks in 1917 (Mortimer G. Barnes, 2020). This hydro station is still in operation as of 2026 and generates 8 megawatts, enough electricity to power about 1,800 homes (Relevate Power | Where We Are, n.d.).

The completion also linked the village to a grander network flowing through Montezuma and Cayuga Lake toward Seneca Lake.

To mark the end of this massive undertaking, the contractors Larkin & Sangster hosted a grand luncheon. Engineers and businessmen gathered to celebrate a feat of modern engineering that had literally redrawn the map of New York.